DRAM Detective · Case File 0.8

The Label, the Ruler, and the Subtraction

Timing numbers have three origins — copy the label, measure with the ruler, subtract the gap.
Some numbers are stamped at the factory…
the label = copy · the ruler = measure · the subtraction = two numbers
the label — stamped at the factory, copied at power-up SPD (the nameplate) tCL · tRCD · tRP tWR · tRFC · tREFI copy controller the die's own physics — read once, never touched again doesn't depend on the board the ruler — measured on-site, every board is different the board's trace the tape measure DQS delay Vref · RTT DFE taps training drives traffic and measures, one value at a time trace length · temperature · voltage — all vary the subtraction — two numbers, no ruler reads the gap max − min = delta the gap between two ranks' timing — no register holds it subtract the two trained numbers, add a tCCD baseline + guardband = the turnaround (Case 1.13)
Step 1 of 3
Copy the label, measure with the ruler, subtract the gap — training always turns the ruler.